spacer
Your Language:
  • english
  • deutsch
  • francais
  • Japanese
VC-Newsletter
Get our Newsletter now!
 kontakt  Contact us
Main Menu
Home
Our Company
News + Events
VC Network
Products
Support + Download
SiteMap
Login Form





Lost Password?
No account yet?
 
Home arrow VC Network arrow Applications arrow Short time cycles: Capping montage control of SMD-Diodes
Short time cycles: Capping montage control of SMD-Diodes Print

The task:
Sensitive SMD-diodes, bonded to a lead frame, are finally capped before completion. In the course of this, the form must be completely coated with epoxy resin. A lead frame contains 72 diodes before being cut. The inspection time corresponds to 250 ms for 24 diodes. Abnormal diodes are identified, and their position is sent to a SPS unit that is linked to the cutting device for subsequent isolation. The sorting out of good from bad diodes then takes place at an additional location. For these processes, three Smart Cameras are in operation.

The advantages:

  • Manual operators are replaced. This leads to a reduction in human error which may occur as workers become tired and lose concentration.
  • Reliable elimination of defective diodes
  • Higher output is possible through quicker time cycles

 

Employed components:

  • 3 PICTOR® Smart Cameras
  • Diffused VICOLUX®-lighting
  • Entocentric VCN-series objective


Read more about Vision & Control

 
< Prev   Next >
spacer
Vision Components::The Smart Camera People
vcseminar_ani.gif
free_call_back_service
VC Smart Camera
VC Smart Single Board Cameras
VC Smart Camera Sensor
 Disclaimer General Terms Contact Member of VDMA Member of EMVA     Member of EMVA   Member of JIIA Japan
© 2008 VC Vision Components GmbH :: The smart camera people
spacer